Power Transformer foundation and oil pit design and drawings are very important component of Substation design. Transformers are large volume of oil containing equipment. Hence oil leakage / burst under abnormal operating conditions may create a fire hazard if the flammable transformer oil spreads in the switchyard. To effect loss prevention, oil must be contained in an oil pit below the transformer and safely drained away to a separate oil tank.
Satcon is designing transformer foundations and oil pits for transformers rated 500MVA, 400kV and below. The sr. engineers and draftsmen of Satcon has very long experience of preparing similar drawings in projects in many countries.